Project matrices

Three planning matrices that check themselves: a RACI chart with role checks and workload, a stakeholder power/interest grid and a change-impact ranking.

    Workload per person

    How to use

    1. RACI: list people across the top and tasks down the side, as comma-separated lines. The page checks every task and counts each person's roles as you type.
    2. Stakeholder grid: give each stakeholder a power and an interest score; they are placed on the grid with the usual way to engage each group.
    3. Change impact: score each change for people affected, size and readiness; changes are ranked high, medium or low. Change the weights to suit your project.
    4. Copy the text boxes into your plan, or use the page's Print button.

    Keyboard and touch

    Arrow keys on the tabsChange matrix
    TypingChecks and pictures update at once

    Tips

    • R = Responsible (does the work), A = Accountable (owns the result and signs off), C = Consulted (asked before), I = Informed (told after).
    • One A per task: when two people are accountable, nobody is.
    • Scores are judgement calls: agree them with the team, then use the picture to start the conversation.
    • High power and high interest: these people can make or break the project, so involve them early.

    About this tool

    The RACI checks follow the usual rules (exactly one Accountable, at least one Responsible, few people to consult); the stakeholder grid is the classic power/interest grid (after Mendelow) split at the middle of each scale; the change score is a weighted average of people affected, size of change and lack of readiness, scaled to 0–100 and split into thirds. Simple, transparent rules, not a project-management method. Nothing is sent anywhere.