Cost accounting lab

Work out standard cost variances, activity-based product costs, job order costing and process costing by equivalent units, with every step shown.

Direct materials

Direct labour

Overhead (applied on standard labour hours)

How to use

  1. Pick a tab. Each one opens with a worked example, so you can see the answer before typing your own figures.
  2. Standard cost variances: type the standards (price, quantity, rate and hours per unit) and what really happened, then press the button. Each variance shows U (cost more than the standard) or F (cost less).
  3. Activity-based costing: list the activities with their cost pools, then a product table: name, units, labour hours and one driver amount per activity. The lab shows each activity rate and compares product costs with one plant-wide labour-hour rate.
  4. Job order costing: type the year's estimated overhead and hours, the actual overhead, and one line per job. The lab applies overhead, places each job in work in progress, finished goods or cost of goods sold, and closes the under- or over-applied overhead.
  5. Process costing: choose weighted average or FIFO and whether materials go in at the start, then type the opening work, this period's units and costs, and the closing work.

Keyboard and touch

TabMove between tabs, boxes and buttons
EnterWork out the open tab (in a number box)

Tips

  • In the variance example, materials cost 1,240 U on price (0.20 more per kg on 6,200 kg) and 800 U on quantity (200 kg more than the 6,000 kg standard).
  • A favourable price variance can cause an unfavourable quantity variance: cheaper material is often lower quality, so more of it is wasted.
  • The fixed overhead volume variance is not money spent. It shows that output differed from the normal capacity used to set the rate.
  • In the activity-based example the low-volume Deluxe model uses most of the setups, so its overhead per unit rises sharply when activities are costed separately.
  • Weighted average and FIFO give the same answer when there is no opening work in progress.

About this tool

Variances follow the usual textbook formulas. Materials price variance = (actual price - standard price) × actual quantity used. Quantity variance = (actual quantity - standard quantity for the output) × standard price. The same pattern gives the labour rate and efficiency variances and the variable overhead spending and efficiency variances. Fixed overhead is applied at budget ÷ normal capacity hours per standard hour, which splits it into a budget variance (actual - budget) and a volume variance (budget - applied). Positive figures are unfavourable (U). The materials price variance here is worked out on the quantity used; some firms work it out when the material is bought.

Activity-based costing divides each cost pool by the total of its driver (setups, inspections, machine hours and so on) and charges products by their use of each driver. Job order costing applies overhead at estimated overhead ÷ estimated base. Under- or over-applied overhead is closed straight to cost of goods sold here; some firms spread it over work in progress, finished goods and cost of goods sold instead. Process costing finds equivalent units. Weighted average pools opening and current costs. FIFO first finishes the opening units, then costs the units started and completed this period at this period's rates. This is a learning tool, not accounting advice.