Revenue recognition lab

Work through IFRS 15 / ASC 606 revenue: variable consideration, allocation by standalone prices, monthly schedules with contract balances, and cost-to-cost progress.

Transaction price

Performance obligations

How to use

  1. Price & allocation: type the fixed price and any variable outcomes (bonuses, penalties, rebates) with their probabilities. Choose expected value (many possible outcomes) or most likely amount (two outcomes, such as a bonus earned or not). Then list the performance obligations with their standalone selling prices.
  2. For each obligation, say whether it is satisfied at a point in time (start month = the month control passes) or over time (start month and number of months, recognised evenly).
  3. Schedule & contract balances: type when the customer is billed. The table shows revenue each month and whether you hold a contract asset (earned but not yet billed) or a contract liability (billed ahead of the work).
  4. Percentage of completion: for a long contract measured by costs, type the costs incurred to date and the latest estimate of total cost for each period.

Keyboard and touch

TabMove between tabs, boxes and buttons
EnterWork out the open tab (in a number box)

Tips

  • In the example the standalone prices add up to 1,000 but the contract price is 960, so each obligation gets a 4 % discount: the licence is recognised at 576.
  • Variable consideration is only included to the extent a big reversal is highly unlikely, which is what the limit box is for.
  • The percentage-of-completion example turns loss-making in period 3, when the estimate rises above the price: the whole expected loss of 40,000 is recognised then.
  • Billing does not decide revenue. A large upfront invoice creates a contract liability that unwinds as the work is done.

About this tool

IFRS 15 and ASC 606 share a five-step model: identify the contract, identify the performance obligations, set the transaction price, allocate it, and recognise revenue as each obligation is satisfied. Expected value = Σ amount × probability; the most likely amount is the single outcome with the highest probability. Either is limited to the amount you type as highly unlikely to reverse. Allocation is in proportion to standalone selling prices. Amounts are worked in cents, and any rounding cent goes to the largest obligation. Over-time obligations are recognised evenly, which suits stand-ready services.

Percentage of completion uses the cost-to-cost input method: progress = costs to date ÷ estimated total cost, and cumulative revenue = price × progress. When the estimated total cost exceeds the price, the remaining part of the loss is provided for at once, so total profit to date equals the whole expected loss. Real contracts raise many more questions (modifications, significant financing, principal versus agent, licences), so this is a learning tool, not accounting advice. Not affiliated with the IASB or the FASB.