Hiking Times, Big Dinners and Knitting Maths: Planning Made Simple

Estimate a hike with Naismith's rule, plan a roast dinner backwards from serving time, and knit to the right size with gauge and even increases.
Some of the most useful maths is about time and size: how long a walk takes, when to put the potatoes in, how many stitches to cast on. Three new tools handle it.
How long will the hike take?
In 1892 the Scottish climber William Naismith wrote down a rule still used today:
- 1 hour for every 5 km forward
- plus 1 hour for every 600 m of climb
A 13 km walk with 800 m of climb takes 13 ÷ 5 + 800 ÷ 600 = 2.6 + 1.33, about 3 hours 56 minutes of walking. Langmuir's additions adjust for the way down. On a gentle 5 to 12° descent, take off 10 minutes per 300 m: with 800 m of descent the estimate drops to about 3 hours 29 minutes. On slopes steeper than 12°, add 10 minutes per 300 m instead.
Tip: time a few of your own walks against the rule and set your pace. Add rest stops, then check the finish time against sunset and keep a margin.
These are estimates for planning: weather, ground and group change real times, so take a map and tell someone your route.
Everything ready at once
A roast dinner is a puzzle: the chicken needs 190°, the potatoes 220°, and there is one oven. The meal timing planner works backwards from serving time. Each dish aims to finish exactly when it must start resting. When two dishes would need different temperatures at once, one moves earlier and is kept warm. You get every step in time order, from "start preparing" to "serve".
Knit to the right size
Gauge turns centimetres into stitches. With 22 stitches per 10 cm, a 50 cm wide piece needs 22 ÷ 10 × 50 = 110 stitches. A 2 × 2 rib needs a multiple of 4 plus 2, and 110 already fits.
To decrease evenly, the calculator writes the round out for you. Going from 60 to 54 stitches in the round gives (K8, K2tog) 6 times: each repeat uses 10 stitches and leaves 9.
Tip: wash your swatch before measuring. Many yarns grow or shrink, and half a stitch per 10 cm adds up across a sweater.
All three tools run in your browser. Try them beside this post.