Cost variances: why did it cost more than planned?
A standard cost is what something should cost. Say a product should use 3 kg of material at 4.00 a kg. You make 2,000 units, so the standard quantity is 6,000 kg. In fact you used 6,200 kg and paid 4.20 a kg.
- Price variance: (4.20 - 4.00) × 6,200 kg = 1,240 unfavourable. You paid more per kg.
- Quantity variance: (6,200 - 6,000) × 4.00 = 800 unfavourable. You used more kg than the standard allows.
Together that is 2,040 more than standard, which is exactly the actual cost (26,040) minus the standard cost (24,000). Labour works the same way, with a rate variance and an efficiency variance.
A favourable price variance can cause an unfavourable quantity variance: cheaper material is often lower quality, so more of it is wasted.
Leases: a liability for the payments still to come
Under IFRS 16 and US GAAP (ASC 842), most leases now go on the balance sheet. The lease liability is the present value of the payments you still owe.
Take 36 monthly payments of 2,000, paid at the start of each month, discounted at 6 % a year (0.5 % a month). The liability is about 66,071, against 72,000 of payments: the difference, about 5,929, is interest spread over the lease.
The right-of-use asset starts from the liability. Add initial direct costs of 1,500 and take off a 1,000 incentive, and the asset is about 66,571.
The cost then shows up in one of two patterns:
- Front-loaded (IFRS 16 and US GAAP finance leases): interest plus straight-line depreciation. Interest is highest at the start, when the liability is largest.
- Straight-line (US GAAP operating leases): one equal cost each period, here (72,000 + 1,500 - 1,000) ÷ 36, about 2,014 a month.
Both patterns add up to the same total over the lease. Only the timing differs.
Audit samples: how many items is enough?
When auditors test a control, they ask: how many items must I check to be confident the error rate is low enough?
With a tolerable deviation rate of 5 % and 95 % confidence, the answer is 59 items if you expect no deviations. The reason is simple: 0.95 multiplied by itself 59 times is just under 5 %. If you expect even 1 % deviations, the sample jumps to 93 items, because the plan must allow for one deviation.
For account balances, monetary unit sampling gives every dollar the same chance of being picked, so big items are picked more often. With a 2,500,000 balance, 75,000 tolerable misstatement, 10,000 expected misstatement and 95 % confidence, a sample of 131 items (an interval of about 19,084) does the job.